Sharkoon T9 Specifications Page 7

  • Download
  • Add to my manuals
  • Print
  • Page
    / 15
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 6
T9
4. Installation of a mainboard
1. Open the case by loosening the thumb screws on the cases back side and removing the left
sidepanel.Laydownthecasesidewiseonanevensurface.
2.The mainboard’s mounting panel inside the case provides various drillings to x the
stand-offs(g.1).
g.1
Themainboardcontainsspecialscrewopenings(g.2).
g.2
Place the mainboard to the mounting panel. A stand-off must be screwed into every
drilling of the mounting panel visible through the mainboard’s screw openings.
Page view 6
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

Comments to this Manuals

No comments